Jerith Driveway & Pavers: The Austin Owner’s Guide
We stock and install Jerith-compatible driveway and paver components across the Austin metro, with most replacements running $7,000 – $18,000 for a full driveway install and $3,500 – $11,000 for a paver patio, depending on square footage and substrate condition. A paver driveway that’s sinking, shifting, or showing cracked units usually needs spot replacement first, then regrading and recompaction underneath. Trevor Nash has seen enough Austin driveways to know the failure usually isn’t the paver itself, it’s what’s under it.

Most homeowners call us after a paver has cracked at the edge, a section has settled into a dip, or they’ve noticed sand washing out between joints after heavy rain. The paver itself is rarely the villain. It’s almost always the base layer giving way beneath it.
Key Takeaways:
- Jerith paver systems fail from the bottom up in Austin’s clay soil, not from the paver surface wearing out.
- Spot repair costs less than full replacement; we’ll tell you honestly which one you need.
- We’re an independent Austin contractor, not affiliated with Jerith, but we work with their paver lines and compatible equivalents daily.
Which Jerith Models This Applies To

Jerith’s driveway and paver lines are built around interlocking concrete units that share a common dimensional standard, most commonly 60mm and 80mm thicknesses for residential driveways. The 60mm units are fine for pedestrian patios and light foot traffic. The 80mm units are what you want under vehicle loads. If someone installed 60mm pavers on a driveway that gets a full-size pickup every day, that’s a compatibility failure waiting to happen, and we see it regularly in neighborhoods like Circle C and Mueller.
Identifying your specific Jerith paver takes about two minutes. Flip over a loose unit and look for the manufacturer’s stamp on the underside. If the stamp is worn or missing, measure the thickness with a tape measure, that tells us whether you have a 60mm or 80mm unit, which narrows the field considerably. For aftermarket options, we typically use Belgard and Unilock equivalents, both of which carry their own manufacturer warranties that layer on top of our 365-Day Done Right Promise. OEM Jerith units are available through specialty supply houses in Austin, but lead times run two to three weeks; aftermarket equivalents are usually on the shelf today.
Styles & brands we work with







Signs Your Jerith Driveway & Pavers Are Failing
- Edge pavers cracking or chipping along the border. This is the classic Austin failure. The base wasn’t extended past the paver edge by 6 – 8 inches, so the border unit has no lateral support. Every tire that rolls over the edge torques the paver until it snaps.
- A dip or depression forming in one section. That’s the base layer failing, not the paver. Austin’s expansive clay soil shrinks and swells with moisture, and if the base wasn’t compacted in lifts, you get a low spot that holds water and accelerates the problem.
- Sand washing out between joints after rain. Joint sand is supposed to lock the pavers together. When it washes out, the pavers start working independently, and independent pavers crack. We see this most after Austin’s spring storm season.
- Pavers shifting or rocking underfoot. A paver that moves means the bedding sand underneath has eroded or settled unevenly. Rocking leads to cracking, and cracking leads to full replacement instead of a simple reset.
- Weeds or grass growing through the joints. Weeds don’t grow through sound, sand-filled joints. If you’ve got green shoots coming up, the joint sand is compromised and water is getting underneath, which is the start of the same settlement cycle.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
A full Jerith-compatible paver driveway in Austin runs $7,000 – $18,000 installed. That range covers tear-out of the old surface, base excavation and recompaction, new paver installation with proper edge restraint, and joint sand. The variables are square footage, whether we’re removing existing concrete or asphalt, and how deep we need to rebuild the base layer. Spot repairs on a failing section run less, but we’ll only quote it if the surrounding area is stable enough to make the repair last.

What drives the price up: poor existing base needing full excavation, drainage corrections, tree roots, and access that prevents a skid steer from getting to the work area. What drives it down: an existing base in good shape where we can remove and reset pavers rather than rebuild from the ground up. Every quote is written, fixed, and in your hands before any work starts. No change orders, no surprises at the door, and the 365-Day Done Right Promise covers the work in writing.
DIY or Call Us?
Paver work is one of the few exterior projects where a careful homeowner can handle a small paver patio reset without much risk. Lifting pavers, adding bedding sand, relaying, and sweeping joint sand is methodical work but not dangerous. That said, a failed driveway with settlement is a different animal entirely. If the base has failed under vehicle load, lifting and re-setting pavers without rebuilding the base is the equivalent of putting a bandage on a broken ankle. You’ll be back in the same spot in eighteen months.
One of the most overlooked safety issues on paver driveways is the edge drop-off. When pavers settle into a low spot and a vehicle parks with a wheel over the edge, the unsupported overhang can snap a paver and send debris flying when the vehicle pulls out. It’s a real hazard, especially for kids on bikes in the driveway. If you’re seeing settlement under the wheel tracks, that’s the point to call us at (325) 225-5429. Tell me what you need, I’ll tell you what it costs, and we’ll go from there.
FAQs

A properly installed paver driveway with an 80mm paver, a compacted aggregate base, and proper edge restraint lasts 25 – 30 years in Austin’s climate. The base layer is the determining factor; pavers themselves rarely wear out, but the base in expansive clay soil has a shorter life if drainage isn’t managed. Call (325) 225-5429 if you’re seeing settlement, and we’ll tell you honestly whether the base is still sound.
Yes, if the surrounding pavers and base are stable. We remove the failed section, rebuild the base layer where it’s compromised, reset the pavers, and re-sand the surrounding joints. The repair carries the same 365-Day Done Right Promise as a full install. If the base failure has spread, though, spot repair becomes throwing good money after bad, and we’ll tell you that up front.
Most full paver driveway replacements in Austin take 3 – 5 working days from tear-out to final sand and compaction. Smaller patios and spot repairs are typically one to two days. We give you a written arrival window before work starts, and our background-checked, uniformed crew leaves the site cleaner than they found it.
We stock compatible Belgard and Unilock paver lines in the thicknesses and color families that match most Jerith installs, which means no two-to-three-week wait for most jobs. If you specifically want OEM Jerith units, we can order them from the local supply house and coordinate the timeline with you. We also carry and install parts and materials from KraftMaid, Cambria, and Silestone for interior projects, so if your driveway project exposes a kitchen or bath need, it’s the same crew and the same written guarantee.
Written by Trevor Nash, Owner, Penhallow Remodeling Austin at Penhallow Remodeling Austin, serving Austin and nearby areas.